(1.POWERCHINA Zhongnan Engineering Corporation Limited, Changsha 410014, China;2.Tuoba Hydroelectric Engineering Construction Management Bureau of Huaneng Lancang River Hydropower Inc., Diqing 674608, China;3.Harbin Motor Factory Co., Ltd., Harbin 150040, China)
TK72
陈源,兰东宏,李立,等. TB水电工程水轮机宽负荷范围运行稳定关键技术研究[J].水利水电科技进展,2024,44(z1):127-130.(CHEN Yuan, LAN Donghong, LI Li, et al. Research on key technologies for wide land operation range stability of hydraulic turbine in TB Hydropower Project[J]. Advances in Science and Technology of Water Resources,2024,44(z1):127-130.(in Chinese))
Copy
