    Abstract:

    The TB Hydropower Project has two diversion tunnels, with one planar stoplog gate with sliding reverse hook installed at the outlet of each diversion tunnel, which are used for flood control before diversion tunnel closure and to block downstream water during sealing construction. The embedded parts of the gate slot are composed of the main rail, bottom sill, door lintel, and end sill. The structural characteristics, installation process, welding process, etc. of the gate can provide reference and guidance for the installation of other similar planar laminated beam sliding anti hook gates.

    Reference
    Related
    Cited by
Get Citation

李永双,齐巨涛,龚登位,等. TB水电工程导流洞出口平面叠梁滑动反钩闸门及埋件安装[J].水利水电科技进展,2024,44(z1):131-133.(LI Yongshuang, QI Jutao, GONG Dengwei, et al. Installation of planar stoplog gate with sliding reverse hook and embedded parts beam at the outlet of the diversion tunnel of TB Hydropower Project[J]. Advances in Science and Technology of Water Resources,2024,44(z1):131-133.(in Chinese))

Copy
Related Videos

Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:September 23,2024
  • Revised:
  • Adopted:
  • Online: April 06,2025
  • Published:
Article QR Code