Construction quality control of cofferdam cutoff wall of TB Hydropower Project
CSTR:
Author:
Affiliation:

(1.Tuoba Hydroelectric Engineering Construction Management Bureau of Huaneng Lancang River Hydropower Inc., Diqing 674608, China;2.China Water Resources and Hydropower Construction Engineering Consulting Northwest Co., Ltd., Xi’an 710000, China;3.Sinohydro Engineering Bureau 8.Co., Ltd., Changsha 410004, China)

Clc Number:

TV642.2

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In view of the problems such as slurry leakage, low drilling efficiency and difficult hole formation in the construction of cutoff walls in the upstream and downstream cofferdams of TB hydropower project, based on the successful construction experience of cutoff walls in previous projects, From three aspects: construction scheme and process, quality control measures, quality inspection and evaluation, the pre-control measures and continuous improvement measures taken in the construction of cutoff wall of TB hydropower project are introduced. It is believed that the measures taken ensure the quality of the project and ensure the construction safety, quality and progress.

    Reference
    Related
    Cited by
Get Citation

李乃利,宋西锋,阚绍江,等. TB水电工程围堰防渗墙施工质量控制[J].水利水电科技进展,2024,44(z1):134-136.(LI Naili, SONG Xifeng, KAN Shaojiang, et al. Construction quality control of cofferdam cutoff wall of TB Hydropower Project[J]. Advances in Science and Technology of Water Resources,2024,44(z1):134-136.(in Chinese))

Copy
Related Videos

Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:September 24,2024
  • Revised:
  • Adopted:
  • Online: April 06,2025
  • Published:
Article QR Code