(1.POWERCHINA Zhongnan Engineering Corporation Limited, Changsha 410014, China;2.Tuoba Hydroelectric Engineering Construction Management Bureau of Huaneng Lancang River Hydropower Inc., Diqing 674608, China)
TU473.1
周军,吴明山,朱小敏,等.施工水患对人工挖孔桩质量的影响及检测方法[J].水利水电科技进展,2024,44(z1):137-139.(ZHOU Jun, WU Mingshan, ZHU Xiaomin, et al. Effects of water hazards on quality of manually excavated piles and detection methods[J]. Advances in Science and Technology of Water Resources,2024,44(z1):137-139.(in Chinese))
Copy
