(1.Sinohydro Engineering Bureau 8.Co., Ltd., Changsha 410004, China;2.Tuoba Hydroelectric Engineering Construction Management Bureau of Huaneng Lancang River Hydropower Inc., Diqing 674608, China;3.China Northwest Water Conservacy & Hydropower Engineering Consulting Co., Ltd., Xi’an 710100, China )
TV642.2
彭林峰,李乃利,宋西锋,等. TB水电工程碾压混凝土取长芯施工技术[J].水利水电科技进展,2024,44(z1):144-146.(PENG Linfeng, LI Naili, SONG Xifeng, et al. Construction technique of roller compacted concrete coring in TB Hydroelectric Project[J]. Advances in Science and Technology of Water Resources,2024,44(z1):144-146.(in Chinese))
Copy
