The design and implementation of Huaneng’s Lancang River Basin-Level smart material management system
CSTR:
Author:
Affiliation:

(1.Tuoba Hydroelectric Engineering Construction Management Bureau of Huaneng Lancang River Hydropower Inc., Diqing 674608, China;2.Wuhan Ins Engineering Technology, Co., Ltd., Wuhan, 430061, China)

Clc Number:

F251

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    By utilizing technologies such as the Internet of Things, big data, and AI recognition, the issue of material management informatization during the construction phase of basin-level hydropower projects is addressed. Firstly, technologies such as digital truck scales, intelligent mixing plants, and intelligent sand and gravel aggregate yards are integrated into individual hydropower stations to achieve intelligent collection of centrally supplied materials. Secondly, through the integration of multiple business processes, automated calculation is achieved for hydropower station demand planning, reconciliation and settlement, and centralized material verification and cancellation. Finally, big data technology is employed to enable intelligent “coordinated dispatch and supply” of centrally supplied materials for basin-level hydropower projects. The system boasts a high level of automation and intelligence, effectively enhancing material management efficiency while ensuring material supply and reducing material occupancy costs

    Reference
    Related
    Cited by
Get Citation

贺华清,王江文,周玲玲,等.华能澜沧江流域级智慧物资管理系统的设计与实现[J].水利水电科技进展,2024,44(z1):147-151.(HE Huaqing, WANG Jiangwen, ZHOU Lingling, et al. The design and implementation of Huaneng’s Lancang River Basin-Level smart material management system[J]. Advances in Science and Technology of Water Resources,2024,44(z1):147-151.(in Chinese))

Copy
Related Videos

Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:September 24,2024
  • Revised:
  • Adopted:
  • Online: April 06,2025
  • Published:
Article QR Code