Method for calculating over-excavation volume of earth-rock in complex terrain
CSTR:
Author:
Affiliation:

(1.Sinohydro Engineering Bureau ;4.Co., Ltd., Xining 810007, China;2.Tuoba Hydroelectric Engineering Construction Management Bureau of Huaneng Lancang River Hydropower Inc., Diqing 674608, China)

Clc Number:

TV512

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In response to the problems of large calculation workload and many duplication of work in the traditional method for calculating over-excavation volume of earth-rock in complex terrain, some functions of Civil 3D software were used for 3D modeling in the excavation process of TB Hydropower Project dam foundation to calculate the over-excavation volume, which can quickly, accurately and intuitively calculate the actual volume of earth-rock.

    Reference
    Related
    Cited by
Get Citation

熊世旺,樊海民,杨超,等.复杂地形土石方超挖工程量计算方法[J].水利水电科技进展,2024,44(z1):152-154.(XIONG Shiwang, FAN Haimin, YANG Chao, et al. Method for calculating over-excavation volume of earth-rock in complex terrain[J]. Advances in Science and Technology of Water Resources,2024,44(z1):152-154.(in Chinese))

Copy
Related Videos

Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:September 26,2024
  • Revised:
  • Adopted:
  • Online: April 06,2025
  • Published:
Article QR Code