Operation chart optimization method of cascade reservoirs based on multiple iteration algorithm
CSTR:
Author:
Affiliation:

Clc Number:

TV737

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Based on the normal operation charts of cascade reservoirs, we proposed a mathematical model of optimal operation chart aiming to reach at the maximum value of annual average electricity generation. In this regard, we suggested a solving algorithm to reduce dimensionalities based on multiple iterations as follow: reduce spatial multi-reservoir dimensionality by iteration in reservoir turns; reduce multi-curve dimensionality by iteration in rule curve turns; and reduce multi-state dimensionality of rule curve with progressive optimality algorithm. Overall, results based on experiments considering Wananxi-Baisha cascade reservoirs as a case studies show that this optimum method provides optimal operation charts of cascade reservoirs in rational form as well as significant increases in electricity generation of the reservoir group while compared with traditional method.

    Reference
    Related
    Cited by
Get Citation

刘烨,钟平安,郭乐,等.基于多重迭代算法的梯级水库群调度图优化方法[J].水利水电科技进展,2015,35(1):85-88.(LIU Ye, ZHONG Pingan, GUO Le, et al. Operation chart optimization method of cascade reservoirs based on multiple iteration algorithm[J]. Advances in Science and Technology of Water Resources,2015,35(1):85-88.(in Chinese))

Copy
Related Videos

Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: April 28,2015
  • Published:
Article QR Code