Application of large tonnage digging filling pile in continuous rigid frame aqueduct of Qianzhong Hydrojunction
CSTR:
Author:
Affiliation:

Clc Number:

TV672+.3

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Large tonnage digging filling piles were used as structural foundation to ensure the integrity of four high-pier and long-span continuous rigid-frame aqueducts during the construction and the operating periods at the first stage of Qianzhong Hydro-junction project. Based on the similarity principle, the structure of large tonnage digging filling pile, referred to the pile construction experience of highway and building industry, and combined with its own loading features, was designed. At the same time, the integrity check and the vertical compressive bearing capacity test of engineering pile were accessed using crosshole sonic logging and core drilling method, and self-balanced method, respectively. The four pile foundations of continuous rigid frame aqueduct were completed in December 2012, and the pile quality tests showed that pile foundation structure was safe and reliable, which fully met the design requirements.

    Reference
    Related
    Cited by
Get Citation

蒙进,徐江,王银军,等.大吨位挖孔灌注桩在黔中水利枢纽连续刚构渡槽中的应用[J].水利水电科技进展,2015,35(2):67-72.(MENG Jin, XU Jiang, WANG Yinjun, et al. Application of large tonnage digging filling pile in continuous rigid frame aqueduct of Qianzhong Hydrojunction[J]. Advances in Science and Technology of Water Resources,2015,35(2):67-72.(in Chinese))

Copy
Related Videos

Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: April 27,2015
  • Published:
Article QR Code