Deformation analysis and safety evaluation of Xiaowan ultra-high arch dam during first impoundment
CSTR:
Author:
Affiliation:

Clc Number:

TV642. 4

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In consideration of some key problems relating to the deformation of the Xiaowan Arch Dam during the first impoundment, the deformation was analyzed with qualitative and quantitative methods, including comprehensive hydrograph analysis, model analysis, numerical simulation, and mathematical statistics. The results show that the dam inclined upstream in the early stage of reservoir impoundment, mainly due to the sinking of the reservoir basin. The reservoir water level was the main factor in the dam deformation, and the time-effect component of the deformation tended to be convergent during the first impoundment. Comparisons of numerical results, modeled results, and designed warning indexes with measured data from the Xiawen Arch Dam, as well comparisons of its measured data with those of other similar projects, demonstrate that the Xiaowan Arch Dam operated normally at the normal water storage level. Although the deformation was relatively large in this case, its regularity was reasonable, demonstrating that the dam was in a safe condition during the first impoundment.

    Reference
    Related
    Cited by
Get Citation

胡波,刘观标,吴中如.小湾特高拱坝首蓄期坝体变形特性分析及评价[J].水利水电科技进展,2015,35(6):68-72.(HU Bo, LIU Guanbiao, WU Zhongru. Deformation analysis and safety evaluation of Xiaowan ultra-high arch dam during first impoundment[J]. Advances in Science and Technology of Water Resources,2015,35(6):68-72.(in Chinese))

Copy
Related Videos

Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: November 25,2015
  • Published: September 05,2015
Article QR Code