TV135;TV675
夏臣智,成立,赵国锋,等.泵站前池单排方柱整流措施数值模拟[J].水利水电科技进展,2017,37(4):53-58.(XIA Chenzhi, CHENG Li, ZHAO Guofeng, et al. Numerical simulation of flow pattern in forebay of pump station with single row of square columns[J]. Advances in Science and Technology of Water Resources,2017,37(4):53-58.(in Chinese))
Copy
