A real-time risk assessment and synthetical early warning model of earth and rockfill dams
CSTR:
Author:
Affiliation:

Clc Number:

TV641

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    To discuss the real-time risk assessment methods for earth and rockfill dams, the point estimation method is adopted for the real-time dam-break probability analysis. The dam-break losses were analyzed based on BREACH and HEC-RAS. According to previous research, new risk evaluation criteria and corresponding risk early warning standards are proposed. A new synthetical early warning model is established combined with the current risk early warning standards for emergency events. The verification example shows that the real-time analysis method of earth and rockfill dam break probability based on point estimation method can meet the requirements of both computational accuracy and efficiency. The synthetical early warning model can effectively improve the early warning capability while reduce the loss caused by excessive early warning to a certain extent. It can provide theoretical basis and technical support for the risk management of earth and rockfill dams.

    Reference
    Related
    Cited by
Get Citation

蔡荨,王昭升,朱思宇,等.土石坝风险实时评估与综合预警模型[J].水利水电科技进展,2018,38(4):57-63.(CAI Qian, WANG Zhaosheng, ZHU Siyu, et al. A real-time risk assessment and synthetical early warning model of earth and rockfill dams[J]. Advances in Science and Technology of Water Resources,2018,38(4):57-63.(in Chinese))

Copy
Related Videos

Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:January 24,2018
  • Revised:
  • Adopted:
  • Online: June 30,2018
  • Published: July 10,2018
Article QR Code