Decision making model and method for maintenance and reinforcement of hydraulic structures based on life cycle cost theory
CSTR:
Author:
Affiliation:

Clc Number:

TV314

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Reinforcement recovery and reinforcement is an important work and long-term task in the field of hydraulic structure, which are of significance to ensure the safety service of the project, to develop the project benefit, and to extend the service period of the project. The cost calculation and decision making model of hydraulic structure maintenance and reinforcement and its algorithm are established under the premise of ensuring structure safety and reliability, with the consideration of the deterioration characteristics of structural performance and the introduction of life cycle cost theory from the objective of optimizing the whole life cycle cost in engineering. The proposed method is applied to a hydraulic structure, and the concrete maintenance plans during the whole life cycle are calculated and formulated. The result shows that the models and methods in this paper can provide some scientific basis for the maintenance and reinforcement strategies of hydraulic structures in the whole life cycle.

    Reference
    Related
    Cited by
Get Citation

苏怀智,高建新,范振东.基于全寿命周期成本理论的水工结构维修加固决策模型[J].水利水电科技进展,2018,38(5):38-42.(SU Huaizhi, GAO Jianxin, FAN Zhendong. Decision making model and method for maintenance and reinforcement of hydraulic structures based on life cycle cost theory[J]. Advances in Science and Technology of Water Resources,2018,38(5):38-42.(in Chinese))

Copy
Related Videos

Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:May 07,2018
  • Revised:
  • Adopted:
  • Online: September 27,2018
  • Published:
Article QR Code