Design and optimization of supplementary mining plans for aggregate storage in Baihetan Hydropower Station
CSTR:
Author:
Affiliation:

Clc Number:

TU521

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    To solve the shortage of useful materials in Baihetan Hydropower Station aggregate storage, taking the site geological conditions, excavation features and time, construction conditions, and economy into consideration, three supplementary mining scheduling programs are designed and optimized based on the re-examined results of the storage. With the help of linear weighted sum(LWS)method, the proposed three mining plans are analyzed for comparison based on four evaluation indexes, including the reserved useful materials, excavation time, construction conditions, and economy. The result shows that the third exploitation plan is the best that can increase 3. 8 million cubic meters of useful materials after excavating. It ensures the supply of aggregate content for the dam concrete program and guarantees the construction of Baihetan Hydropower Station.

    Reference
    Related
    Cited by
Get Citation

丁晓唐,覃牧,崔恩豪.白鹤滩水电站料场补充开采规划优选设计[J].水利水电科技进展,2018,38(5):43-47.(DING Xiaotang, QIN Mu, CUI Enhao. Design and optimization of supplementary mining plans for aggregate storage in Baihetan Hydropower Station[J]. Advances in Science and Technology of Water Resources,2018,38(5):43-47.(in Chinese))

Copy
Related Videos

Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:April 25,2018
  • Revised:
  • Adopted:
  • Online: September 27,2018
  • Published:
Article QR Code