TV673+.3
王芳芳,吴时强,高昂,等.大古水电站坝前排沙运行方式与排沙漏斗形态[J].水利水电科技进展,2019,39(2):51-55.(WANG Fangfang, WU Shiqiang, GAO Ang, et al. Desilting operation modes and sand funnel patterns in front of Dagu Hydropower Station Dam[J]. Advances in Science and Technology of Water Resources,2019,39(2):51-55.(in Chinese))
Copy
