    Based on numerical simulation, the flood control safety of the No. 2 ogee spillway tunnel on the left bank of the Xiaolangdi Hydropower Station was analyzed from the aspects of discharge capacity, cross-sectional velocity, tunnel space, piezometric head, cavitation number and jet flow induced scouring. The simulated results were compared with a 1∶40 physical model experiment. Meanwhile, corresponding measures were proposed to solve the common safety problems during the operation of the ogee spillway tunnel. The results show that the simulated results are basically consistent with the experimental results, which indicates that it is feasible to use numerical simulation to analyze the flood control safety for the ogee spillway tunnel.

    Reference
    Related
    Cited by
Get Citation

张春晋,孙西欢,李永业,等.基于数值模拟的小浪底龙抬头式泄洪洞防洪安全分析[J].水利水电科技进展,2019,39(6):68-74.(ZHANG Chunjin, SUN Xihuan, LI Yongye, et al. Flood control safety analysis of Xiaolangdi Dam Ogee Spillway Tunnel based on numerical simulation[J]. Advances in Science and Technology of Water Resources,2019,39(6):68-74.(in Chinese))

Copy
Related Videos

Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: December 24,2019
  • Published:
Article QR Code