Water hammer pressure calculation and protective measures for rock plug blasting engineering
CSTR:
Author:
Affiliation:

Clc Number:

TV134

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    To study the change rule of water hammer pressure produced by pressure pipes after rock plug blasting in a water intake project, based on the method of characteristics, the one-dimensional transient flow theory and the working principle of actual blasting, a mathematical model of rock plug blasting in a water intake for water conservancy projects is established combined with the requirements of pipeline safety control. The results of numerical simulation show that the pressure in the pressure pipeline fluctuates greatly after blasting, and the negative pressure is easy to cause water hammer of cavities collapsing accidents under the vaporization pressure. Therefore, additional water hammer protection measures are needed to ensure the pipeline safety. Increasing the area of the shaft can reduce the extreme value of the water hammer pressure, and the larger the area of the ventilation shaft, the smaller the pipe pressure. When the shaft diameter increases to 10. 0 m, the negative pressure value can meet the requirements.

    Reference
    Related
    Cited by
Get Citation

张小莹,张健,陈胜,等.岩塞爆破工程水锤压力计算及防护措施[J].水利水电科技进展,2020,40(4):27-32.(ZHANG Xiaoying, ZHANG Jian, CHEN Sheng, et al. Water hammer pressure calculation and protective measures for rock plug blasting engineering[J]. Advances in Science and Technology of Water Resources,2020,40(4):27-32.(in Chinese))

Copy
Related Videos

Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 05,2020
  • Published:
Article QR Code