基于ANUGA和SWMM耦合模型的车陂涌流域内涝模拟分析
作者:
作者单位:

(1.华南理工大学亚热带建筑科学国家重点实验室,广东 广州 510640;2.琶洲实验室,广东 广州 510335;3.华南理工大学土木与交通学院,广东 广州 510640)

作者简介:

雷向东(1994—),男,博士研究生,主要从事海绵城市水文水环境研究。E-mail:ctleixiangdong@mail.scut.edu.cn 通信作者:曾照洋(1994—),男,助理研究员,博士,主要从事城市洪涝模拟研究。E-mail: zyzeng86@scut.edu.cn

通讯作者:

中图分类号:

P333.2

基金项目:

国家自然科学基金(51879107,U1911204,52209019);广东省科技计划(2020A0505100009)


Simulation analysis on Chenbei watershed waterlogging based on ANUGA and SWMM coupling model
Author:
Affiliation:

(1.State Key Laboratory of Subtropical Building Science, South China University of Technology, Guangzhou 510640, China;2.Pazhou Lab, Guangzhou 510335, China;3.School of Civil Engineering and Transportation, South China University of Technology, Guangzhou 510640, China)

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 文章评论
    摘要:

    为探究设计暴雨雨峰位置对城市内涝的响应规律,以广州车陂涌流域某片区为研究区,基于ANUGA和SWMM构建耦合模型AGSWM,采用实测降雨的流量和内涝数据对AGSWM进行验证,并对不同雨峰位置的设计暴雨情景进行了内涝模拟与分析。结果表明:耦合模型AGSWM具有良好的模拟精度,能够较好地反映车陂涌内涝时空演进过程;在低重现期后峰情景和高重现期中峰情景下,内涝积水总量、总淹没面积、重度内涝等级的淹没面积和重度内涝等级的易涝点最大水深较大;在低重现期前峰情景、高重现期后峰情景下,积水峰现延迟时间较长。

    Abstract:

    In order to explore the law of urban waterlogging response to the designed position of rain peak during storm, taking a certain area in the Chebei watershed in Guangzhou as an example, a coupled model AGSWM was constructed based on ANUGA and SWMM model, and verified with measured rainfall and waterlogging data. The waterlogging simulation analysis was carried out for the designed storm scenarios with different rain peak positions. The results showed that the AGSWM has good simulation accuracy and is able to reflect the temporal and spatial evolution of Chenbei watershed waterlogging properly. Under the post-peak scenario during low return period and the mid-peak scenario during high return period, total amount of accumulated water, total inundated area, submerged area with severe waterlogging and maximum water depth of severe waterlogging-prone points are relatively large. Under the pre-peak scenario during the low return period and the post-peak scenario during the high return period, the delay of peak of water accumulation are relatively large.

    参考文献
    相似文献
    引证文献
引用本文

雷向东,王兆礼,曾照洋,等.基于ANUGA和SWMM耦合模型的车陂涌流域内涝模拟分析[J].水资源保护,2023,39(3):82-90.(LEI Xiangdong, WANG Zhaoli, ZENG Zhaoyang, et al. Simulation analysis on Chenbei watershed waterlogging based on ANUGA and SWMM coupling model[J]. Water Resources Protection,2023,39(3):82-90.(in Chinese))

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2022-04-25
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2023-05-30
  • 出版日期: