等高截水工程实施后东海县河网区水系格局及连通性变化定量分析
作者:
作者单位:

(1.河海大学水文水资源学院,江苏 南京 210098;2.南京水利科学研究院水灾害防御全国重点实验室,江苏 南京 210029;3.连云港市水利规划设计院有限公司,江苏 连云港 222006 )

作者简介:

王宗志(1977—),男,正高级工程师,博士,主要从事水资源复杂系统运行调度与管理研究。E-mail:zzwang@nhri.cn 通信作者:王坤(1992—),男,工程师,博士,主要从事流域水文水动力过程模拟与调控研究。E-mail:wangkun@nhri.cn

通讯作者:

中图分类号:

基金项目:

江苏省水利科技项目(2023014);国家自然科学基金青年科学基金项目(52409037);江苏省基础研究计划自然科学基金青年基金项目(BK20230122);江苏省自然科学基金面上项目(BK20211023);浙江省水利科技计划项目(RA2201)


Quantitative analysis of water system pattern and connectivity changes in river network area after implementation of contour interception project in Donghai County
Author:
Affiliation:

(1.College of Hydrology and Water Resources, Hohai University, Nanjing 210098, China;2.State Key Laboratory of Water Disaster Prevention, Nanjing Hydraulic Research Institute, Nanjing 210029, China;3.Lianyungang Water Conservancy Planning and Design Institute Co., Ltd., Lianyungang 222006, China)

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 文章评论
    摘要:

    为定量揭示等高截水工程实施对东海县河网区水系格局及功能的影响,以东海县龙梁河-石安河河网区为研究对象,基于水系形态结构分析法、图论与景观生态学法、复杂网络方法,提出了考虑区域和节点两个层面的水系结构及连通性综合分析方法,计算了等高截水工程实施前后河网区水系的形态结构和连通性变化。结果表明:在水系结构方面,等高截水工程实施后河流的发育数量和发育长度分别提升了76.39%和77.95%;在区域层面,等高截水工程通过横向连接孤立河网,使得区域河网的水系环度、节点连接率和水文连通度指数分别提高了101.29%、37.27%和35.23%,水系整体结构连通性显著增加;在节点层面,由于等高截水工程具有双向连通能力,节点功能连通性显著提升,节点传播能力和重要程度的空间分布得到优化。

    Abstract:

    In order to quantitatively reveal the influence of the implementation of the contour interception project on water system structure and function in the river network area in Donghai County, taking the Longliang River-Shian River network area in Donghai County as the research object, a comprehensive analysis method of water system structure and connectivity at regional and nodal levels was proposed based on the analysis method of water system morphological structure, graph theory and landscape ecology method, and complex network method. The morphological structure and connectivity changes of the river network area water system before and after the implementation of the contour water interception project were calculated. The results showed that, in terms of water system structure, the number and length of rivers increased by 76.39% and 77.95%, respectively, after the implementation of the contour interception project; in terms of regional connectivity, the contour interception project connected isolated river networks laterally, increasing the water system circularity, node connection rate, and hydrological connectivity indexes of the regional water network by 101.29%, 37.27%, and 35.23%, respectively, and significantly improving the overall structural connectivity of the water system. The nodal function connectivity was significantly improved, and the spatial distributions of node propagation ability and node importance were optimized due to the bidirectional connection ability of the contour interception project.

    参考文献
    相似文献
    引证文献
引用本文

王宗志,张安齐,王坤,等.等高截水工程实施后东海县河网区水系格局及连通性变化定量分析[J].水资源保护,2025,41(3):31-38, 64.(WANG Zongzhi, ZHANG Anqi, WANG Kun, et al. Quantitative analysis of water system pattern and connectivity changes in river network area after implementation of contour interception project in Donghai County[J]. Water Resources Protection,2025,41(3):31-38, 64.(in Chinese))

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2024-12-15
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2025-06-12
  • 出版日期: